A Randomly Selected Newspaper Headline:
The following is a randomly selected newspaper headline from many years ago:
Welcome to my blog. Please feel free to leave a comment. I assure you I always read and appreciate everything you have to say. Unfortunately, thanks to Blogger being, well . . . Blogger, I can not respond to comments nor leave any on your blogs. They simply disappear into the ether. Occasionally I will remember to respond in the next blog post I put up, but usually these good intentions slip my mind. So if you want to ask a question or get a response to any comments you may have please leave an email address or other contact method in your comment and I will get back to you.
I have also added a separate page to the blog for the Tower of Magic with a brief summary of all the rooms of the ToM in the one spot. The link is just below this and above the main body of the blog, or you can just click here.
Pages
Showing posts with label tudor bakery. Show all posts
Showing posts with label tudor bakery. Show all posts
Tuesday, January 5, 2010
The Bakery - Stage Two - Part One
With all the chores of the Christmas season out of the way, I started work on Stage Two of the Bakery on Boxing Day. My first task was to make a firm decision on the layout of the house. Way back when I started the basement block (stage one) the plan was to have the oven on the side and the trapdoor access to the surface on the back wall, but somewhere along the way I changed the plan and swapped the position of the oven and trapdoor. This means that the chimney carrying the smoke from the oven in the basement had to run up the back wall of the house, not the side as I originally planned. I also originally planned to have the trapdoor emerging inside the ground floor shop, but no matter how I drew it, having the shop positioned over the trapdoor just didn't work, so in the end I left it outdoors. The trapdoor now emerges under the outside steps up to the first floor. This is probably a little inconvenient for the bakers, but the structure of the steps gives me somehting to attach the pulleys to so that the bakers can lift their bread out of the basement via a 'dumb waiter' type of system.
So, with a new layout plan decided, I started work on the house. First came the 'framework'. I cut six posts (at 7" high) from 1/2" square stick of spruce wood to form the outline of the ground floor and to hold up the first floor. I drilled a hole in the top and bottom of each post and a hole in the 'ground' (the top of the basement block) where each post would go and used a piece of toothpick as a 'dowel' to help hold the posts in place. (The holes in the tops of the posts also hold toothpicks that pass through the beams above and into the first floor posts, but that comes later.) Next came the horizontal beams that connected the tops of the posts. These were made from balsa wood strips that I had 'stained' with a mix of watered down paint to look something like oak. I started with the two side beams which were - carefully - pushed over the toothpicks jutting up from the posts until the toothpicks emerged from the top. The remaining beams were then fitted and glued in place. This was the result:
This photo is taken from the back left corner. The space between the back left post, the centre left post, the centre right post and the back right post is the space where the bakers shop will be.
The next step was to make and fit the stairs to the first floor. These are again made from balsa wood. Normally when I make stairs like this I use lils (craft pins) to hold everything together. This works well, but leaves a metal 'nail head' showing along the side for each step. As I wanted my steps to be metal free, I used toothpicks again. The toothpicks are glued to the uderside of each step and then each end of the toothpick is poked through the side piece - which I think is what should be called the 'stringer'. The ends of the toothpick were then cut off. This makes the toothpick almost invisible, unless you happen to lie under the staircase and look up.
With the stairs made, I positioned two more posts and used beams to tie them into the existing structure and fixed the stairs to the beams. As you can see in the photo, my current test dummy Naked Neville took a stroll about to see what he thought while the glue was drying.
Before moving on to the next floor, I cut pieces of foamboard to act as the 'walls' and this next photo shows how effective adding walls can be!
I'll add another post soon with the details of the first floor construction!
Friday, September 25, 2009
The Bakery - Week Five
I'm still concentraiting on finishing the staircases for MB's, so progress on the Bakery is going slowly at the moment. The photo below pretty much tells the story for the week - the oven is (mostly) finished and installed and the access ladder has been made and installed. Not shown in the picture is the sewer section, which I have made look a little 'dirtier' and added 'water' to the central channel.
Labels:
1/12,
miniature,
tudor bakery
Wednesday, September 16, 2009
The Bakery - Week Four
Labels:
1/12,
dollhouse,
dollshouse,
miniature,
scale,
tudor bakery
Friday, September 11, 2009
The Bakery - Week Three
Wednesday, August 19, 2009
Two for One . . .
It was kind of inevitable wasn't it?
After all, I couldn't decide whether to do the Dragon's Maiden or the Magician's Lookout first, so I did both together. So this time 'round when I had trouble choosing between two ideas I suppose I always knew I'd end up giving up on choosing and doing both together.
And so I have.
Form now on I am officially working on both a medieval/tudor bakery and a victorian gothic house. At this point the projects are simple called "The Bakery" and the "Victorian Gothic". Hopefully they will attract more inspired titles as they develop.
As I've mentioned in earlier blog posts, both projects will make use of cheap flat-packed shelf units. The Victorian Gothic will be built into two shelving units, a three shelf and a two shelf. Here's a pic of each unit assembled as per the instructions:
They will be side by side with doors and stairwells cut in at appropriate places. They create space for five rooms which at the moment will be: a bedroom, a lounge-come-study, an entrance hall with feature staircase, a "seance" room where the house's resident psychic conducts business and a kitchen, perhaps with an additional partition wall to create space for a scullery behind.
The Bakery will start with the basement which will be built into this box:
Yes, I do know that subterranean bakeries are not exactly common, historically or now, but when did I ever say I was trying for historical accuracy? Besides, having the bakery on a different level to the 'shop' means that I can give each area more space and thus more detail.
As the next photo shows, I have started work on the basement by cutting boards for a 'fake' floor and front facade. The main chamber is the bakery, accessed by a ladder leading to a hatch onto the 'street' level. Of the two smaller chambers at the bottom, one is for storage (of flour sacks etc) while the other is for a sewer.
I think that someone associated with the bakery is engaged in smuggling and uses the access between the storage space and the sewer to come and go unseen. Perhaps the mill where the flour comes from is close to a gem mine and gems are being smuggled into the city in the flour sacks? I haven't quite decided what the story is here, but something nefarious is definitely going on.
Subscribe to:
Posts (Atom)