A Randomly Selected Newspaper Headline:
The following is a randomly selected newspaper headline from many years ago:
Welcome to my blog. Please feel free to leave a comment. I assure you I always read and appreciate everything you have to say. Unfortunately, thanks to Blogger being, well . . . Blogger, I can not respond to comments nor leave any on your blogs. They simply disappear into the ether. Occasionally I will remember to respond in the next blog post I put up, but usually these good intentions slip my mind. So if you want to ask a question or get a response to any comments you may have please leave an email address or other contact method in your comment and I will get back to you.
I have also added a separate page to the blog for the Tower of Magic with a brief summary of all the rooms of the ToM in the one spot. The link is just below this and above the main body of the blog, or you can just click here.
Pages
Wednesday, January 6, 2010
The Bakery - Stage Two - Part Two
Tuesday, January 5, 2010
The Bakery - Stage Two - Part One
With all the chores of the Christmas season out of the way, I started work on Stage Two of the Bakery on Boxing Day. My first task was to make a firm decision on the layout of the house. Way back when I started the basement block (stage one) the plan was to have the oven on the side and the trapdoor access to the surface on the back wall, but somewhere along the way I changed the plan and swapped the position of the oven and trapdoor. This means that the chimney carrying the smoke from the oven in the basement had to run up the back wall of the house, not the side as I originally planned. I also originally planned to have the trapdoor emerging inside the ground floor shop, but no matter how I drew it, having the shop positioned over the trapdoor just didn't work, so in the end I left it outdoors. The trapdoor now emerges under the outside steps up to the first floor. This is probably a little inconvenient for the bakers, but the structure of the steps gives me somehting to attach the pulleys to so that the bakers can lift their bread out of the basement via a 'dumb waiter' type of system.
So, with a new layout plan decided, I started work on the house. First came the 'framework'. I cut six posts (at 7" high) from 1/2" square stick of spruce wood to form the outline of the ground floor and to hold up the first floor. I drilled a hole in the top and bottom of each post and a hole in the 'ground' (the top of the basement block) where each post would go and used a piece of toothpick as a 'dowel' to help hold the posts in place. (The holes in the tops of the posts also hold toothpicks that pass through the beams above and into the first floor posts, but that comes later.) Next came the horizontal beams that connected the tops of the posts. These were made from balsa wood strips that I had 'stained' with a mix of watered down paint to look something like oak. I started with the two side beams which were - carefully - pushed over the toothpicks jutting up from the posts until the toothpicks emerged from the top. The remaining beams were then fitted and glued in place. This was the result:
This photo is taken from the back left corner. The space between the back left post, the centre left post, the centre right post and the back right post is the space where the bakers shop will be.
The next step was to make and fit the stairs to the first floor. These are again made from balsa wood. Normally when I make stairs like this I use lils (craft pins) to hold everything together. This works well, but leaves a metal 'nail head' showing along the side for each step. As I wanted my steps to be metal free, I used toothpicks again. The toothpicks are glued to the uderside of each step and then each end of the toothpick is poked through the side piece - which I think is what should be called the 'stringer'. The ends of the toothpick were then cut off. This makes the toothpick almost invisible, unless you happen to lie under the staircase and look up.
With the stairs made, I positioned two more posts and used beams to tie them into the existing structure and fixed the stairs to the beams. As you can see in the photo, my current test dummy Naked Neville took a stroll about to see what he thought while the glue was drying.
Before moving on to the next floor, I cut pieces of foamboard to act as the 'walls' and this next photo shows how effective adding walls can be!
I'll add another post soon with the details of the first floor construction!
Monday, January 4, 2010
Back on Schedule
Just a quick post to let everybody know that now the Christmas break is over I'm back to working on my normal schedule (which unfortunately also means I'm back to the grind at work) and should be back to adding a minimum of a blog post per week. Over the break, I made a flying start on the second stage of the Bakery, but I'll add that post in a day or two. In the meantime, I already have the photos of my progress so far on Flickr, so go take a look!
Wednesday, December 16, 2009
Nine Days 'Til Christmas
Well, it isn't perfect - and I still HATE the "Entrance Hall" as it just looks AWFUL - but for now at least I am classing Madame Bellerose's house as finished. At some point in the future I will probably rip everything out of the hall and try again though. I've added light fittings, stair railings and all the other items that the house still needed last time I updated this blog. Everything has been taken out of the house and thoroughly dusted (it's amazing how fast dust and cat hair can build up) and the clear front of the house has been put in place to protect it. The photos of the finished house are on Flickr.
There is still too much to do between now and Christmas. Throughout the year my mother always starts projects - from digging up the garden to redecorating the house - then never finishes them. Of course everything has to be "perfect" for Christmas, so everyone gets roped into finishing these projects, last weekend was re-laying the floor in the dining room. On top of that are the things that only get done once a year (on account of we're all too lazy) like polishing my Grandma's silver tea set which was in such a state it took me all afternoon. So on account of not having time to work on anything interesting, this will probably be the last post on this blog until after Christmas.
Friday, December 4, 2009
Madame Bellerose's - Week Fifteen
At this point there are far too many things on the list of things to be done before Christmas in the 1:1 scale world for me to have much time to work in the 1:12 scale world and so have more or less given up on my aim to have this house finished before Christmas. This week I managed to install the finials on the stair posts in the Lounge and Bedroom - and NOTHING else. I only got that much done because I gave up looking for something fancy/gothic and used plain round balls. I didn't have enough balls for the stairs from ground to middle floor as well, so that's still not done. I haven't even taken a photo of the 'finished' stairs yet!
To finish the house I need to make and/or install:
-Faux Lights (Lounge, Seance Room, Hall)
-Stair Rails and Finials (Seance Room, Hall)
-2-3 Large potted plants (Hall)
-Elaborate Cat Bed (supposed to be the Bedroom, but no room left! Have to find somewhere to squeeze it in!)
-Seat or side table (Hall)
-Fix anything that looks wrong when everything else is in place!
It really isn't a long list, maybe I can finish before Christmas after all?
Monday, November 23, 2009
Madame Bellerose's & The Bakery - Weeks 13 & 14
Wednesday, November 11, 2009
Madame Bellerose's & The Bakery - Week Twelve
Another combined post this week due to a minimum of progress on either project. This is due to three main reasons.
1) After months of cool, wet weather Tasmania has suddenly gotten HOT. Okay, hot by Tassie standards, around 30 degees C. This is a problem because no one is aclimatised to the heat yet, so it seems hotter than it actually is and it is staying hot at night so no one is getting any sleep and the combination is making everyone with sense lethargic. And when you try to do anything with glue or paint, it is dry almost as soon as it comes out the container.
2) Christmas is coming. Only another 45 days to go and lots of things that need to be done beforehand. Over the weekend I spent several hours assembling flat-packed furniture for my mother and various other things that she wants done before Christmas. In fact I usually give up even trying to work on any craft projects in December as there is just too many other things to see to.
3) The task I set myself for the week was to dress the people who will populate both projects. For the bakery and the staff of MB's, this is fairly easy and straight-forward. Simple dresses, aprons, leggings and tunics. The guests at the seance are another matter however. The people here are supposed to be dressed 'formal'. For the men this means jackets (which I HATE making). For the time being I am adding one male guest in the clothes he was bought in and if I decide I need more men, I'll worry about that later on. The women I want to dress in the bustle dress style of the 1870-80s. These are much more complicated dresses than any I have tried before (at least without a pattern.) I decided to start with the guest who has fainted at the seance and is lying on the couch/sofa to recover. I only need to worry about the front of her gown and thus I can cheat by not adding a bustle or any complicated details on her rear. I have finished this lady (with the possible exception of a little trim here and there) and I think I now know how best to work on the others - I just have to get brave enough to try!
Anyway, here are the photos of what I did get done:
Friday, November 6, 2009
Madame Bellerose's - Week Eleven
In MB's lounge room, the cats are up to mischief . . . . .
Since I started this house, I really haven't liked the way it was looking - but suddenly it's all started to come together and is looking GREAT! The seance room, which I really, seriously considered gutting at one point and starting again is now starting to look fabulous. The bedroom is almost finished - just needs a rug or two on the floor. The lounge needs lights and it too will be basically done. The kitchen needs the doorways to the scullery re-doing. They all need some people.
The only real problem at the moment is the entry hall. Having two curved staircases might have seemed like a good idea at the time, but now they're in place there is no way to add anything else to the room without it looking crowded or just plain wrong, yet leaving it empty is also a bad look. At the moment I'm thinking of making a big, fancy chandelier to hang in the middle of the room and then putting a ladder beneath it and having someone in the process of cleaning the chandelier. This would fill in the space in an interesting way, but wouldn't really tie up with the goings on in other parts of the house.
Like the Bakery, MB's is up to the point where I feel Ican start adding people.
Bedroom: At this point probably empty, but perhaps a maid straightening things up
Seance: Populated by a few well dressed ladies and gents attending a seance. MB herself will be leading the seance, of course.
Lounge: Resting on the couch, one of the ladies from the seance who fainted as a result of the eerie dramas of the seance.
Kitchen: A cook is directing the preparations of refreshments for the guests. Under her watchful eye are one or two maids/assistants
Hall: Perhaps a servant cleaning something, perhaps someone else, perhaps no one??????
The Bakery - Week Eleven
Is it really eleven weeks since I started The Bakery? Is it really only 49 days until Christmas? . . .
Again this week, more work was done to MB's than the Bakery, but the Bakery did gain some vital features. Most important, the lights! Suspended from the Bakery ceiling is a 'chandelier' holding drippy wax candles to 'light' the Bakery. The candles are made of real wax, but the wicks are fake. Contray to my fears, the chandelier is yet to fall down and it has been in place since Sunday, so hopefully that means it isn't going to fall down and whack some poor baker on the head. Now all I have to do is get the thing to hang straight . . . There are also some extra candles scattered about the bakery for extra lighting.
The other main advance in the Bakery (if you can call it an advance) was the invasion of the mice. Mice, who tend to resemble some hideously deformed tadpoles, now infest the Sewer section, are hiding behind sacks in the Storage area and a few brave mice have headed into the bakery proper in search of fresh crumbs.
Next, I need to dress and wig some dolls to work in the bakery and the basement block sectiion of this project will (baring a few details here and there) be complete. At the moment I'm thinking there'll be the following characers
The Master Baker - The guy in charge of it all, probably working at the front table
The Pie Maker - Working at the side back table, oddly enough making pies
The Stoker - A younger person with the job of tending the oven fire and keeping an eye on the bread so it doesn't burn
The Thief/Smuggler - Sorting gems from flour in the Storage area after they have been smuggled into the city in the flour sacks
The Thief's Assistant - Waiting in the sewer to carry away the ill gotten gains
Thursday, October 29, 2009
The Bakery & Madame Bellerose's - Week Ten or Fun with Polymer Clay
Labels:
1/12,
dollhouse,
dollshouse,
miniature,
scale
Thursday, October 22, 2009
Madame Bellerose - Week Nine
Labels:
dollhouse,
dollshouse,
miniature,
scale
Wednesday, October 14, 2009
Madame Bellerose's - Week Eight
First let me explain that there is no post on the progress of the Bakery this week as I haven't made any - I spent all my time working on MB's instead. Having said that you're probably expecting me to say I got a lot of things done to MB's, but you'd be wrong. This was one of those weeks when nothing really seemed to get done. True I built an entire table, renovated eight chairs and painted two rooms worth of furniture - but none of it is finished yet.
For the Seance Room I made a table around which the Seances and other mystical activities can be held. Traditionally such a table would be round, but to make it a little different and a little less like a re-creation of King Arthur's round table, I made my table hexagonal. With the exception of the legs, which are short posts designed for scrapbooking of all things, the table is made from balsa wood. The chairs I have had for years - they were $2 for two at a certain bargain outlet all Tasmanians are familiar with. I cut out the backs of the chairs and replaced them with a solid back in the shape of a gothic arch. With that done I painted the lot, along with the bedroom furniture and gave everything a coat of gloss sealer.
Friday, October 9, 2009
Week Seven and a Half - You Must Know Which Projects I Mean by Now
Tuesday, October 6, 2009
Week Seven - Madame Bellerose's & The Bakery
Labels:
dollhouse,
dollshouse,
miniature,
scale
Friday, October 2, 2009
The Bakery and Madame Bellerose's - Week Six
It's been another week when not very much seems to have progressed. I have almost finished the curved stairs in MB's, too bad they look awful. MB's also has some "stained glass windows" added, but I need to figure out how to frame/finish them before they'll look right. Having tried to make some casing for arounf the doorways myself, I have now ordered some of the ready-made variety. The Bakery now has working trapdoors in the hatchways and is pretty much ready for furniture, accessories and people to start being made/added - unless I decide to start work on the rest of the shop/house above first. The plan is to finish the basement block bakery first, then move on to the rest, but now I'm wondering if it might be easier to do it the other way around.
Subscribe to:
Posts (Atom)